Installation circuits with switches (module system
Student experiments involving installation technology with modules on mounting wall.
OBJECTIVES:
- Basic elements of installation technology
- Basic circuits of installation technology
- Basic circuits of lighting technology
The experimentation module system comprises convenient, robust experimentation modules that can be individually arranged on a mounting wall freely and clearly corresponding to the circuit diagram. The modules are also coloured for a better overview.
A transparent rear wall enables the conventional equipment used to be viewed. The module engages in the mounting wall with the help of an elastic catch, thus preventing it from falling out when inserting the connecting elements.
The electrical components are connected directly to the corresponding safety sockets using 4-mm safety connecting lines for low voltage and 2-mm safety connecting lines for extra-low voltage.
METHOD:
Student experiments following task description in the manual.
- Arrangement of the elements
- Routing the wiring
- Checking the function
TARGET GROUP:
Vocational training: Electrical engineering in trade and industry
Low learning level, preliminary knowledge: Principles of installation technology and instruction about the dangers of electrical engineering.
The system could be supplemented by protection measures.
Topics:
E4.1.2.1 U 4.100 Installation circuits with switches
- Connecting an activation point (off, series and group circuits)
- Connecting two activation points (two-way connections)
- Connecting more than two activation points (cross connection)
The follow setup installation technology is special optimized for ELWE equipment.
Main components:
1 | 8-2204001-000-12-0 8 | BS 4.0 Mains connection AC, 10 A |
3 | 8-2204101-000-12-0 4 | BS 4.101 Distribution Box |
1 | 8-2204102-000-12-0 8 | BS 4.102 Automatic Circuit-Breaker, 6 A |
1 | 8-2204111-000-12-0 8 | BS 4.111 Series Switch |
1 | 8-2204112-000-12-0 4 | BS 4.112 Two way switch |
1 | 8-2204114-000-12-0 4 | BS 4.114 Intermediate switch |
1 | 8-2204150-000-12-0 4 | BS 4.150 Lamp socket E14, single |
1 | 8-2204120-010-12-0 | BS 4.120 Mains socket with earthing contact |
1 | 505 272 8 | Bulbs, 230 V/40 W, E14, set of 2 |
1 | 8-5304111-100-10-0 4 | LIT-print: Installation circuits with switches, German |
1 | 8-5304112-100-10-0 4 | LIT-print: Installation circuits with switches |
1 | 8-2405211-000-10-0 4 | Voltage and continuity tester 6...400 V |
1 | 726 30 8 | Assembly Grid L130 |
8 | 500 604 8 | Safety experiment cable, 10 cm, black |
10 | 500 624 4 | Safety experiment cable, 50 cm, black |
6 | 500 644 8 | Safety experiment cable, 100 cm, black |
1 | 500 664 4 | Safety connection lead, 200 cm, black |
5 | 500 602 4 | Safety experiment cable, 10 cm, blue |
3 | 500 622 4 | Safety experiment cable, 50 cm, blue |
3 | 500 642 4 | Safety experiment cable, 100 cm, blue |
5 | 500 601 4 | Safety connection lead, 10 cm, red |
3 | 500 621 4 | Safety experiment cable, 50 cm, red |
4 | 500 641 8 | Safety experiment cable, 100 cm, red |
1 | 500 640 4 | Safety connecting lead, 100 cm, yellow/green |
Student experiments involving installation technology with modules on mounting wall.
OBJECTIVES:
- Basic elements of installation technology
- Basic circuits of installation technology
- Basic circuits of lighting technology
The experimentation module system comprises convenient, robust experimentation modules that can be individually arranged on a mounting wall freely and clearly corresponding to the circuit diagram. The modules are also coloured for a better overview.
A transparent rear wall enables the conventional equipment used to be viewed. The module engages in the mounting wall with the help of an elastic catch, thus preventing it from falling out when inserting the connecting elements.
The electrical components are connected directly to the corresponding safety sockets using 4-mm safety connecting lines for low voltage and 2-mm safety connecting lines for extra-low voltage.
METHOD:
Student experiments following task description in the manual.
- Arrangement of the elements
- Routing the wiring
- Checking the function
TARGET GROUP:
Vocational training: Electrical engineering in trade and industry
Low learning level, preliminary knowledge: Principles of installation technology and instruction about the dangers of electrical engineering.
The system could be supplemented by protection measures.
Topics:
E4.1.2.1 U 4.100 Installation circuits with switches
- Connecting an activation point (off, series and group circuits)
- Connecting two activation points (two-way connections)
- Connecting more than two activation points (cross connection)
The follow setup installation technology is special optimized for ELWE equipment.
Main components: